We were asked to assist a customer who was moving his manufacturing site to a new premises in Beaumont Lees Leicester. The move involved stripping down and repositioning
a fully enclosed dry back spray booth and drying room, which required reconfiguring the exhaust ducting to suit the new site. Their existing filter system was refurbished, repaired and modified enabling it to be sited externally at the new premises. A complete new ducting system was installed to serve both the repositioned and new joinery machinery.